| 
Kieker 1.9 | |||||||||
| PREV NEXT | FRAMES NO FRAMES | |||||||||
| Packages that use ScheduledSamplerJob | |
|---|---|
| kieker.monitoring.core.controller | |
| Uses of ScheduledSamplerJob in kieker.monitoring.core.controller | 
|---|
| Methods in kieker.monitoring.core.controller that return ScheduledSamplerJob | |
|---|---|
 ScheduledSamplerJob | 
MonitoringController.schedulePeriodicSampler(ISampler sampler,
                        long initialDelay,
                        long period,
                        TimeUnit timeUnit)
 | 
 ScheduledSamplerJob | 
SamplingController.schedulePeriodicSampler(ISampler sensor,
                        long initialDelay,
                        long period,
                        TimeUnit timeUnit)
Schedules the given ISampler with given initial delay, and period. | 
 ScheduledSamplerJob | 
ISamplingController.schedulePeriodicSampler(ISampler sampler,
                        long initialDelay,
                        long period,
                        TimeUnit timeUnit)
Schedules the given ISampler with given initial delay, and period. | 
| Methods in kieker.monitoring.core.controller with parameters of type ScheduledSamplerJob | |
|---|---|
 boolean | 
MonitoringController.removeScheduledSampler(ScheduledSamplerJob sampler)
 | 
 boolean | 
SamplingController.removeScheduledSampler(ScheduledSamplerJob sensorJob)
Stops future executions of the given periodic ScheduledSamplerJob . | 
 boolean | 
ISamplingController.removeScheduledSampler(ScheduledSamplerJob sampler)
Stops future executions of the given periodic ScheduledSamplerJob . | 
  | 
Kieker 1.9 | |||||||||
| PREV NEXT | FRAMES NO FRAMES | |||||||||